Book a demo

Home › Resources › Payroll for construction companies: rules and software

Payroll for construction companies: rules and software

Construction payroll means paying crews who change job sites, trade classifications and sometimes pay rates within the same week. Public projects add prevailing wage rules and weekly certified payroll reports. Payroll software for construction must track hours by project and classification and support accurate job costing.

Prevailing wage on public work

Federally funded construction contracts above the threshold are covered by the Davis-Bacon and Related Acts. Workers must receive the wage and fringe benefit rates in the wage determination for their classification, and contractors submit weekly certified payrolls, typically on Form WH-347 or an equivalent. Many states have their own prevailing wage laws for state and local projects, with different rates and reporting.

Fringe benefits

The fringe portion of a prevailing wage can be paid in cash or through bona fide benefit plans. Contributions to plans count toward the requirement; any shortfall must be paid in cash. Keep plan documentation in case of an audit.

Multiple rates and overtime

Travel time and job sites

Driving from the shop to the first job site after picking up tools is usually hours worked. Normal commuting from home to the site is not. Travel between sites during the day always counts. Track these segments separately to avoid unpaid overtime.

Workers' compensation and class codes

Premiums depend on class codes. Assigning hours to the correct code, such as carpentry versus clerical, matters for audits.

Evaluating construction payroll software

  1. Can crews punch from their phones at each job site with location?
  2. Are hours tagged by project, phase and classification?
  3. Does it calculate blended overtime and prevailing wage rates?
  4. Can it produce the data needed for certified payroll reports and job costing?
  5. Does a foreman approve hours before payroll closes?

How Alobri fits construction teams

Crews clock in from their phones at each site using Alobri Time and Attendance, choosing the project and task. Alobri Overtime Control calculates blended rates, and Alobri Payroll stores hours by classification, the information your team needs to prepare certified payroll and job cost reports. Rates and rules are configured by your company with its advisor.

How Alobri helps

Payroll

Alobri Payroll does this work with your own data; TalentIA proposes and your team decides.

Country legal setup

Benefits and accruals

Digital pay slips

AlobriPayroll
  • Home
  • People
  • Reports
  • Settings
  • TalentIA
0Active today
0Pending
0Exceptions
ECEmily CarterApproved
JLJames LeeIn review
SMSofia MartinezPending
DBDaniel BrooksApproved
Illustrative view with sample data

FAQ

Is certified payroll required on all construction jobs?

No. It applies to covered public projects under federal or state prevailing wage laws.

Does travel between job sites count as hours worked?

Yes, travel during the workday between sites is hours worked.

Can fringe benefits be paid in cash?

Yes. Prevailing wage fringe amounts can be paid as cash, benefits or a combination.

Always check the official source: U.S. Department of Labor, IRS.

Related topics

Get started with Alobri Payroll in the United States