Home › Guides › Shift scheduling
How to build rotating shift schedules in Ecuador (2026)
To build a rotating shift schedule in Ecuador, start from the hours of coverage you need, design shifts within the 8-hour day and 40-hour week, guarantee two days of continuous weekly rest, account for the night surcharge between 19:00 and 06:00, and check whether your operation needs an approved special schedule from the Ministerio del Trabajo.
Step 1: measure coverage needs
List each area and the minimum people needed per hour, for example 4 operators from 06:00 to 22:00 and 2 overnight. This demand curve, not habit, should drive the schedule.
- Step 1
Register sites, departments and roles with their base schedule.
- Step 2
Create the shift types your operation uses.
- Step 3
Generate the weekly or rotating schedule and publish it to employees.
- Step 4
Compare the schedule against actual punches and adjust next week.
Step 2: choose a rotation pattern
| Pattern | Shape | Typical use |
|---|---|---|
| Fixed shifts | Same hours every week | Offices, retail with stable traffic |
| Weekly rotation | Morning, afternoon, night in turn | Plants, security |
| Compressed or special schedules | Longer days with more rest | Remote sites, flower farms, mining |
| Split shifts | Two blocks in one day | Restaurants |
Special and compressed schedules that depart from the standard day usually require authorization from the Ministerio del Trabajo. Ask your advisor before adopting them.
Step 3: apply the legal limits
- Ordinary day of 8 hours and week of 40 hours.
- Two consecutive rest days per week, normally Saturday and Sunday, or other days in continuous operations.
- Night surcharge for ordinary work between 19:00 and 06:00.
- Supplementary hours with written agreement and within daily and weekly caps.
- Public holidays marked as rest days in the calendar.
Step 4: build and test the roster
- Create shift templates in Alobri Shift scheduling.
- Assign teams to the rotation and let the system flag rest-day or hour conflicts.
- Check fairness: night and weekend shifts spread evenly.
- Publish at least one week in advance so workers can plan.
- Allow swap requests with supervisor approval.
Step 5: monitor and adjust
Compare planned shifts with actual marcaciones. If one team always ends with overtime, the pattern may be short of people. TalentIA proposes adjustments, such as an overlapping mid-shift, and the manager decides whether to apply them.
Example rotation
Example: a 24/7 security post with three 8-hour shifts needs at least five guards to give each one two rest days per week without overtime; with four guards, the gap becomes recurring supplementary hours.
How Alobri helps
Shift scheduling
Alobri Shift scheduling does this work with your own data; TalentIA proposes and your team decides.
Schedule templates
Automatic rotation
Legal validation
- Home
- People
- Reports
- Settings
- TalentIA
| Approved | |
| In review | |
| Pending | |
| Approved |
FAQ
Can workers rest on days other than the weekend?
Yes, in operations that must run continuously, as long as they receive their weekly rest days. Check the arrangement with your advisor.
What counts as night work in Ecuador?
Work between 19:00 and 06:00 is considered night work and carries a surcharge on the hourly value.
Do workers see the schedule on their phone?
Yes. Alobri publishes each person's shifts to their phone and records changes.
Always check the official source: Ministerio del Trabajo, IESS, SRI.