Home › Guides › Shift scheduling
How to build rotating shift schedules in Mexico (2026)
Rotating shifts are common in Mexican plants, hospitals, security services and retail, and the LFT sets different maximum hours for day, night and mixed shifts. This guide explains how foreign-owned operations can build rotating schedules in Mexico that cover demand, respect rest rules and avoid unnecessary overtime.
Shift types defined by the LFT
| Shift | Time window | Daily maximum |
|---|---|---|
| Diurna (day) | Between 6:00 and 20:00 | 8 hours |
| Nocturna (night) | Between 20:00 and 6:00 | 7 hours |
| Mixta (mixed) | Spans both, with less than 3.5 hours at night | 7.5 hours |
A mixed shift with 3.5 hours or more at night is treated as a night shift.
- Step 1
Register sites, departments and roles with their base schedule.
- Step 2
Create the shift types your operation uses.
- Step 3
Generate the weekly or rotating schedule and publish it to employees.
- Step 4
Compare the schedule against actual punches and adjust next week.
Rest rules to build in
- At least one full rest day for every six days worked, preferably Sunday.
- A Sunday premium of at least 25 percent for those who work on Sunday.
- At least 30 minutes of rest during a continuous shift.
- Mandatory holidays paid with an additional double salary when worked.
Step 1: calculate coverage
Estimate how many people each post needs by hour and day. Add a margin for absences and vacation, which since 2023 reaches at least 12 days a year from the first year.
Step 2: choose a rotation pattern
Common patterns include weekly rotation between day, mixed and night shifts, or fixed shifts with rotating rest days. Twelve-hour patterns exceed daily maximums and generally generate overtime; analyse them with counsel before adopting them.
Step 3: publish and manage changes
Publish schedules at least a week in advance and record every swap with approval. Changing a worker's shift unilaterally and permanently may be considered a change in working conditions; use the contract and internal regulations to define how rotation works.
Differences from US scheduling
Night shifts are shorter by law, overtime is double or triple rather than time and a half, and the weekly rest day is a statutory right with premiums attached. Copying a US roster of five eight-hour nights usually breaks the night shift maximum.
Step 4: check results
- Compare planned and actual hours weekly.
- Track overtime by shift type.
- Review absence patterns on night shifts.
Scheduling with Alobri
Alobri shift scheduling builds rotating templates, checks rest and maximum hours against rules you configure and publishes rosters to phones. TalentIA can propose a draft based on coverage needs; supervisors adjust and approve.
How Alobri helps
Shift scheduling
Alobri Shift scheduling does this work with your own data; TalentIA proposes and your team decides.
Schedule templates
Automatic rotation
Legal validation
- Home
- People
- Reports
- Settings
- TalentIA
| Approved | |
| In review | |
| Pending | |
| Approved |
FAQ
How long can a night shift be in Mexico?
The ordinary maximum is seven hours; extra time counts as overtime.
Is Sunday work allowed?
Yes, with a premium of at least 25 percent of the daily salary and a different rest day.
Can we use 12-hour shifts?
They exceed ordinary daily limits, so hours beyond the maximum count as overtime. Review with counsel.
Always check the official source: STPS, SAT, IMSS.